Para limpar uma bomba instalada, siga o procedimento de desligamento da bomba:

Feb 24, 2022|

Para limpar uma bomba instalada, siga o procedimento de desligamento da bomba:

 

1. Remove all water cooling lines and cut off the primary circuit power supply to the pump heater. 2. Release all pump oil. 3. Unscrew the inlet and front pipe connection bolts and remove the pump from the system. 4. Remove the water cooling cap (if applicable). 5. Remove the nozzle assembly in accordance with the method described in the operation manual of the specific pump model. 6. Carefully clean the inside of the pump body with acetone and flush with isopropyl alcohol. The pump is then blown dry with clean, dry, oil-free compressed air. 7. Carefully clean nozzle assembly with acetone. Wipe all surfaces with isopropyl alcohol and blow dry them with clean, dry, oil-free compressed air. 8. Reinstall the nozzle and water cooling cap to the pump body. Make sure the nozzle is properly aligned with the front stage system (if applicable). 9. Check the condition of o-rings. Replace o-rings that show any signs of aging or compression. 10. Connect the pump to the system.

Aviso:
Não use perto de uma-fonte de alta temperatura. Ventile a área de trabalho com um ventilador e use uma bomba de difusão em uma grande sala bem-ventilada. Aparelhos de respiração separados também podem ser usados, se necessário.
Certifique-se sempre de que as operações de limpeza sejam realizadas em uma sala grande e-bem ventilada. Por favor, use óculos de proteção, luvas e roupas de proteção.

motocycle parts coating

Empresa IKS PVD, máquina de revestimento decorativo, máquina de revestimento de ferramentas, máquina de revestimento DLC, máquina de revestimento óptico, linha de revestimento a vácuo PVD, o projeto chave na mão-está disponível. Entre em contato conosco agora, E-e-mail:iks.pvd@foxmail.com


Enviar inquérito